SKY WIND Asakusa | Apartment in Tokyo
8 Bedroom Apartment in Azumabashi, Tokyo
Comfortable Living
SKY WIND Asakusa in Tokyo offers a modern apartment with free WiFi, air-conditioning, and a balcony. The property includes a washing machine, private bathroom, and a fully equipped kitchen with a refrigerator, microwave, and stovetop.Convenient Facilities
Guests benefit from a elevator and a work desk. Additional amenities include a wardrobe, hairdryer, electric kettle, and kitchenware. The apartment ensures a comfortable and functional stay.Prime Location
Located 16 mi from Tokyo Haneda Airport, the apartment is near attractions such as Chiisanagarasunohonno Museum (2-minute walk), Sumida Riverside Hall (984 feet), and Asakusa Station (4-minute walk).SKY WIND Asakusa is located in Tokyo.
This 8 Bedrooms Apartment is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Heating, Internet, Air Conditioner, and several others. This is a 3 star rated property and has over 1 review with the average score of 8 . Coming to Tokyo and needing a place to stay? Be it for work or for leisure, consider staying at this Apartment for your next visit, you will surely love it.
You can check the reviews and description of this 8 Bedrooms Apartment if you want to learn more about this place in Tokyo. These details are authentic, as they are provided by our partner, booking.com.
This SKY WIND Asakusa in Tokyo is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “SKY WIND Asakusa”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Apartment, please let us know.
Amenities
Facility Overview
-
Heating
-
Smoke-free property
-
Non-smoking rooms
-
Air conditioning
-
Elevator
-
Invoice provided
-
Free Wifi
-
Wifi
-
Internet
-
Smoke alarms
-
Fire extinguishers
-
CCTV in common areas
-
Staff follow all safety protocols as directed by local authorities
-
Physical distancing rules followed
-
Cashless payment available
-
Contactless check-in/out
-
Property cleaned by professional cleaning companies
Policies
This property does not accommodate bachelor(ette) or similar parties, please inform of your expected arrival time in advance. you can use the special requests box when booking, or contact the property directly using the contact details in your confirmation.
Room Arrangement
| Room Info | Facilities |
|---|---|
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
23 m2
|
BathroomBidet, Body soap, Bathtub, Toilet, Private bathroom, Shampoo, Conditioner, Towels, Hairdryer, Toilet paper, ShowerGeneralHeating, Fire extinguisher, Trash cans, Air conditioning, Smoke AlarmOutdoorsBalconyKitchenRefrigerator, Microwave, Kitchenware, Kitchen, Washing machine, Cleaning products, Electric kettle, StovetopBedroomWardrobe or closetAccessibilityAccessible by elevator |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
23 m2
|
BathroomBidet, Body soap, Bathtub, Toilet, Private bathroom, Shampoo, Conditioner, Towels, Hairdryer, Toilet paper, ShowerGeneralHeating, Fire extinguisher, Trash cans, Air conditioning, Smoke AlarmOutdoorsBalconyKitchenRefrigerator, Microwave, Kitchenware, Kitchen, Washing machine, Cleaning products, Electric kettle, StovetopBedroomWardrobe or closetAccessibilityAccessible by elevator |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
22 m2
|
BathroomBidet, Body soap, Bathtub, Toilet, Private bathroom, Shampoo, Conditioner, Towels, Hairdryer, Toilet paper, ShowerGeneralHeating, Fire extinguisher, Trash cans, Air conditioning, Smoke AlarmOutdoorsBalconyKitchenRefrigerator, Microwave, Kitchenware, Kitchen, Washing machine, Cleaning products, Electric kettle, StovetopBedroomWardrobe or closetAccessibilityAccessible by elevator |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
23 m2
|
BathroomBidet, Body soap, Bathtub, Toilet, Private bathroom, Shampoo, Conditioner, Towels, Hairdryer, Toilet paper, ShowerGeneralHeating, Fire extinguisher, Trash cans, Air conditioning, Smoke AlarmOutdoorsBalconyKitchenRefrigerator, Microwave, Kitchenware, Kitchen, Washing machine, Cleaning products, Electric kettle, StovetopBedroomWardrobe or closetAccessibilityAccessible by elevator |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
22 m2
|
BathroomBidet, Body soap, Bathtub, Toilet, Private bathroom, Shampoo, Conditioner, Towels, Hairdryer, Toilet paper, ShowerGeneralHeating, Fire extinguisher, Trash cans, Air conditioning, Smoke AlarmOutdoorsBalconyKitchenRefrigerator, Microwave, Kitchenware, Kitchen, Washing machine, Cleaning products, Electric kettle, StovetopBedroomWardrobe or closetAccessibilityAccessible by elevator |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
23 m2
|
BathroomBidet, Body soap, Bathtub, Toilet, Private bathroom, Shampoo, Conditioner, Towels, Hairdryer, Toilet paper, ShowerGeneralHeating, Fire extinguisher, Trash cans, Air conditioning, Smoke AlarmOutdoorsBalconyKitchenRefrigerator, Microwave, Kitchenware, Kitchen, Washing machine, Cleaning products, Electric kettle, StovetopBedroomWardrobe or closetAccessibilityAccessible by elevator |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
23 m2
|
BathroomBidet, Body soap, Bathtub, Toilet, Private bathroom, Shampoo, Conditioner, Towels, Hairdryer, Toilet paper, ShowerGeneralHeating, Fire extinguisher, Trash cans, Air conditioning, Smoke AlarmOutdoorsBalconyKitchenRefrigerator, Microwave, Kitchenware, Kitchen, Washing machine, Cleaning products, Electric kettle, StovetopBedroomWardrobe or closetAccessibilityAccessible by elevator |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
22 m2
|
BathroomBidet, Body soap, Bathtub, Toilet, Private bathroom, Shampoo, Conditioner, Towels, Hairdryer, Toilet paper, ShowerGeneralHeating, Fire extinguisher, Trash cans, Air conditioning, Smoke AlarmOutdoorsBalconyKitchenRefrigerator, Microwave, Kitchenware, Kitchen, Washing machine, Cleaning products, Electric kettle, StovetopLiving AreaDeskAccessibilityAccessible by elevator |
FAQ's
Is this property pet-friendly for guests?
No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.
What time is check-in & check-out at property?
Check-in time for SKY WIND Asakusa starts counting from 4:00 PM and check-out is until 10:00 AM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.
Does the property have a swimming pool?
No, this SKY WIND Asakusa does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in property?
Best-rates for the SKY WIND Asakusa starts from $144 per night with includes Air Conditioner, Accessibility, Security/Safety, Guest Services, Heating, Internet with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is property a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is not considered to be a family-friendly property. As reported by the owner or manager, the apartment has not specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the property wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the SKY WIND Asakusa has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the property?
Based on the information reported by the owner or manager, the SKY WIND Asakusa indicates 1 day stay policy at this apartment. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for property?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.